Updated Surplus Numbers

Updated Surplus Numbers
Updated Surplus Numbers: Actual surplus 2018 per audit was $85,163.
Boards 2011-2018 implemented policies and procedures with specific goals:
stabilize owner fees, achieve maintenance objectives and achieve annual budget surpluses.
Any surplus was retained by the association.
The board elected in fall 2018 decided to increase owner fees, even in view of a large potential surplus

Average fees prior to 2019

Average fees prior to 2019
Average fees per owner prior to 2019:
RED indicates the consequences had boards continued the fee policies prior to 2010,
BLUE indicates actual fees. These moderated when better policies and financial controls were put in place by boards

Better budgeting could have resulted in lower fees

Better budgeting could have resulted in lower fees
Better budgeting could have resulted in lower fees:
RED line = actual fees enacted by boards,
BLUE line = alternate, fees, ultimately lower with same association income lower had
boards used better financial controls and focused on long term fee stability
Showing posts with label Lakecliffe Drive Deterioration. Show all posts
Showing posts with label Lakecliffe Drive Deterioration. Show all posts

Monday, October 5, 2015

Lakecliffe Reconstruction is Proceeding - Update

0 comments
Bookmark and Share


Updates Friday, October 16 

2:30pm - Workers are removing construction vehicles. Major work is complete. Stripping, cleanup and misc. landscaping remains. Residents should read the construction signs and follow directions.



7:30am - Wheaton's trash and recycling contractor was on the property at 6:07am to clear the way for the asphalt trucks. This was as pre-arranged by the association. The street was prepared at 7:15am and the first asphalt truck arrived at 7:33am. Work is beginning at Salisbury which is a more complex paving area. It will then proceed toward Briarcliffe Blvd.




Updates Thursday, October 15 

5:00pm - Driveways are complete, all barricades are down. Notices are posted in the building lobbies, all 44 of them. Bottom line is, we a moving to final street asphalt tomorrow. Equipment has been positioned and this will be a period of intense activity.

10:00am photos - Work on driveways and parking is proceeding:

Everyone is watching the weather radar as the conditions are overcast. Rain would not be welcome at this time:




7:00am/8:00am:
Yesterday early afternoon management did post update notices in the entry foyers of buildings directly impacted. The HOA website was also updated.  Work is proceeding on the driveways.

Update Wednesday, October 14. 10:30am
Well, things did slow down but work it about to resume. Completion of driveways will be next. Then the final street work. The interruption and delay with ComEd has been resolved, I understand. We are all eager for this to be completed. Look for postings in the lobby of your building, and check the official HOA website from time to time. At this point, it is in the hands of the professionals.

Update Saturday, October 10, 2015. Photos 10:30am
Work is progressing well and will continue next week. Multiple notices have been posted advising residents of adjustments to trash and recycling pickup, street parking restrictions and construction updates.

It was a good week. Weather cooperated and the contractor, our management, maintenance and several board members worked diligently to make this as rapid, trouble free project as is possible within reasonable budgets. Additional communication efforts were also made.

Next week should be the conclusion. Of course, this will be determined by weather and breakdowns. Breakdowns? What's that?  For example, with the construction in the area cement is in short supply. Cement is a vital ingredient in concrete which is used for curbs and walks. There was a power outage (two, actually) and this also delayed the work while ComEd researched the problem.



Sample of Photos, October 9, 2015











Update Wednesday October 7, 2015, Photo at 3:46pm
Two notices were posted in the entrance of each building in the construction zone and on every cul-de-sac that connects to Lakecliffe.  One is on the bulletin board and the second is taped to the glass so anyone inside can see it. Additional notices were added to each of the construction signs. This is under the request of the engineer and the contractor. No parking on New Asphalt. No kidding. Towing is probable.





Update Wednesday October 7, 2015, Photo at 8:33am
The binder course is being laid. This is one step of this multi-step process. Another layer of asphalt will be laid in a day or a few.  This new surface cannot be parked on tonight. Notices will be posted in the areas with the new street or the connecting cul-de-sacs. Large signs will also be posted.



Original Post Monday October 5, 2015
The view early this morning.



Monday, July 27, 2015

Lakecliffe Blvd - Downgraded to "Planned 2015"

0 comments


Bookmark and Share


The masthead and a recent post include a diagram of the street project. Readers may have noticed that I tagged a portion of Lakecliffe Blvd as "Planned 2015." The use of "planned" was deliberate. The project has been delayed and the board has yet to provide full approval to proceed. We've been talking about this particular project since 2014. This section of this street is planned for 2015. So why is the schedule currently deteriorating more rapidly than the street?  On June I concluded that this project was in jeopardy and downgraded this project to only "planned." At this point there is a possibility it may not be completed in 2015.

How can I say this? It's my opinion that if a major project lacks a definitive schedule by July 15 of any current year that it will be increasingly difficult and more likely that it won't be completed in the current calendar year or for the budgeted price. It may also delay other, subsequent or conjoined projects.  That's the situation for the repaving of the second portion of Lakecliffe. Prior to the July meeting I advised the board and management via email that I had concerns that this street work would be further delayed. During the July meeting I concluded that urgency was lacking. In a few days it will be August, we remain in formulation and this cannot change until August 13, the next HOA meeting. There are no guarantees the board will move this forward in August. Delays will and do require contractors and the board members who are involved in this project to jump through hoops. That may be part of a plan. At this point I'd say, "Don't expect me or anyone else to jump through hoops."

What is occurring on Lakecliffe is nothing new. In fact, it was once remarked "We've been doing things this way since long before you arrived [and it worked fine]." In private I have disagreed and in this blog I've published only a small portion of what is fit to print and an alternative view.

It may simply be that a decision has been made that we've spent enough this year. We do discuss cash flow and we remain far ahead of the 2011 reserve balance requirement and the minimums set by the board two years ago. That is not an excuse to spend money. With water main failures each year, it is merely common sense to tackle mains crossing under streets. A street should last 35 years. A water main break under a street would also be terribly disruptive to residents. With reluctance on the part of some board members, the mains were replaced.

How are we doing with reserves? In 2016 our reserve balance should be about $1,500,000 higher than projected in 2011. The formal plan indicates that reserves should be $66,834 at the end of the 2016. We'll probably be at about $1,500,000 after Lakecliffe and with only nine roofs remaining in that project. The plan also indicates that our fees should be much higher than they currently are, with a collection of $488,000 in 2015 and $508,000 in 2016.

Our actual reserve collection in 2015 will be $376,000 which leaves $333 more in the pocket of each owner in 2015. That's about $28 less each month in fees. That is a lot of money.

When the board decided not to proceed with certain projects and would not set a schedule for them, I took the position we shouldn't collect money we have no intention of spending according to the plan. I've published charts on this in the past. In other words, a re-evaluation of projects by recent boards required a re-evaluation of reserve requirements. If we are going to delay certain projects then there is no need for excessive funding. In fact, this spring I initiated bids for stream repairs, which is one of those languishing areas at BLMH. (One is in good condition, one fair and one poor). It is probable this will require 5 years or more to do, and we do have some decks sinking into the streams as wooden piles rot. Boards prior to the ROCs decided to ignore these problems and probably had to once they realized what they had committed this HOA to when they began the roofing project in 2002. The ROCs, in an attempt to keep fees "as low as possible" also chose to ignore. How long can we delay? As long as boards roll the dice.

Why is scheduling for complex projects so difficult? We did a street last year. So what's the problem this year? This is a more complex project and it will be more costly. That was probably a trigger. We spent a lot last year and now we are going to spend more! Then we replaced water mains. That was probably the straw that broke the camel's back.

Let's say it is about a clash of ideals. Yes, you can take a horse to water but you can't force him or her to drink. I stated that the north section of Lakecliffe replacement in 2014 was a demonstration project. We want a street that can achieve a normal life, not fail within 10 years requiring that we tear up the HOA yet again. There is also the residual charge from the failure to increase fees yet again. But if this HOA won't come up with a real plan 5-10 years with specifics about capital projects then I have told the board publicly that I will not support reserve fee increases. In other words, I see no reason to penalize or punish owners for no purpose. Our fees really are high enough.

As I've written in earlier posts since 2009, planning at BLMH is sequential and at times haphazard; things may occur as a consequence of "no other choice." In colloquial parlance, I should state it this way. Moving forward requires that all board members agree, and some don't or do so unwillingly. Some still believe our fees should be higher than they are. In other words, a delay will keep reserves higher than they would otherwise be, as the money will not be spent.   The ownership, little involved, is usually oblivious of the politics.

The concept called "fast track" doesn't exist in the BLMH universe. We know what "emergencies" are; all other projects fall into the "eventual" category. Why is this HOA so able to deal with "emergencies?" One reason and perhaps the most important is because an emergency sidesteps the board. Management is free to act and to make decisions and is supported by a few. So the bureaucracy is side stepped and boards can justify the spending as "We had no choice in the matter."

Life cycle analysis is another foreign concept. I've observed that boards simply review the cost. That's one of three reasons our streets failed prematurely. There remains some resistance to spending more money to build something that will provide good service for two or three times longer. My point is, a street that costs $150,000 and is designed for 20-30 years is a bargain compared to a street that costs $110,000 and fails in less than 10 years.

Maintenance is also automatic but "projects" are not. We'll do annual maintenance because management and our maintenance contractor are on top of that and made plans during the previous winter. There doesn't seem to be a problem or any hesitation to spend maintenance dollars. Reserves are an entirely different matter. That is a historical perspective. Boards for decades did a "good" job planning maintenance budgets. Most get an "F" for future planning because they ignored or glossed over the reality of reserves, and began a $1,900,000 project without telling owners about the financial consequences (fees) which would be required by this board decision. Maintenance was and may remain the emphasis. Reserves, once called the "Replacement Fund" were allowed to languish. Possibly with good reason because after adjusting fees to meet reserve requirements the allocation increased from a low of 5% of fees to 25% to 30% of our fees. Our reserve contribution is the major source of our increase in fees and the financial pain experienced by some owners.

If we immediately removed reserve contributions from owner's fees that would immediately reduce fees by a substantial amount. That's the way it was for a decade or more and dealing with long term planning is a problem for most boards. Oddly, these same boards can, did and do worry about total destruction of the infrastructure. Go figure? But that's part of the "Look before you leap" and "He who hesitates is lost" mentality. We can always pull up some argument.

Annual maintenance is akin to survival planning. As some of us are operating merely from survival, it is no surprise to me that long term project planning is so difficult. We take steps to "maintain" the property. A long term president once remarked to me "You can slap paint on a pig, but it is still a pig." From this remark, I can understand why it is always like pulling teeth. There is this foundational attitude, historical ambivalence or hostility to reserves, a reluctance to spend money until it can't be avoided and the opinion that things worked well before.

Planning is also hampered by a lack of communications. Not all board members use email (according to management); that is apparently true, because some board members never respond to an email. I can only conclude that is their choice, because some of us do have Facebook pages, etc. Yes, there is also a need to discuss these things in an open forum. But then, we've been discussing this particular project since 2014 and each month in 2015.

A variety of board members have been avoiding the street project since 2007. In such an environment projects may be delayed, deferred, or drag on and on and on, waiting for someone to point out the elephant in the room. That too is nothing new at BLMH. I'm sure a few other HOAs have this problem. I've been told ours is well run. That makes me wonder about just what a poorly run HOA must be like.

Are there legitimate reasons from my urgency this year? A deteriorating street, potential water main issues, a need to hold pricing (materials costs are escalating and the board was advised of this in January-February of this year), a domino effect upon other projects (driveways, drainage work, roofs, exterior work and painting, etc.) and sufficient reserve funds. Need I go on?

What's the current status of the Lakecliffe street project and how did we get here? Let's take a look at the general sequence of events for this particular project in 2015:
  • General Board discussion occurred during a meeting. I'll call this Meeting #1: Is this project to occur in 2015? Are we to go for engineering support and what is the scope of the project? This question is posed: Should we consider replacing the water mains under this street? I declined in 2014 to perform any kind of engineering for this HOA (I did the same in 2009 before running for the board and have done so consistently). Reluctantly for a few it was decided to spend some money on a proper engineer. 
  • Further discussion at a later HOA meeting, which I'll call Meeting #2. Board agrees upon the segment of Lakecliffe and to approach an engineer and get an engineering bid for drawings and specifications.
  • Several meetings later. Review engineering drawings. The board approves proceeding for street contract bids. Again discuss concerns about water mains under Lakecliffe. Argument: isn't this the appropriate time to do this? Board is hesitant and reluctantly agrees to get proposal for replacement of water mains. (Reluctance = a lack of enthusiasm). 
  • At a subsequent meeting, with a bid in hand, the board approves work to replace mains under the street at three locations. This work is then rushed and completed in a matter of weeks so the street work can commence ASAP. I was there for the entire project as was the Maintenance Director and I was the "eyes and ears" for this HOA. I took samples and photos of the mains removed and provided a verbal report, a sample of the removed main to the board during two successive HOA meetings. 
  • At meetings #5 & 6, discuss condition of Salisbury after replacement of water mains and installation of new fire hydrant and valves. Advise board of engineer's opinion about Salisbury repaving; the engineer was brought on site by management and at the request of the Architectural Director (me) while the main replacement was underway to review the condition of Salisbury. "Destruction" of this cul-de-sac was more extensive than expected. Board approves having engineer prepare drawings for replacement of Salisbury Court. Engineer's budget analysis is discussed, but no approval to direct management to proceed by the board. So, the project triggers are not pulled. As a consequence, project is again delayed. 
  • Status as of July 23: Waiting for the next board meeting to decide to proceed or to abandon this project for 2015. 
So that brings us to today. We have engineering drawings for Lakecliffe Blvd, and a contractor, but no overall approval to proceed. That's the way it is. Eventually we'll get all our ducks in a row and the work will proceed. At this time, am I optimistic about the 2015 schedule? No, I am not. Am I frustrated or disappointed? Yes. More often than not, these things drag on. For example, replacing the bridge and patio over at the Thames waterfall; that's taken three years for partial completion, but the dangerous stuff was all taken care of. At this point, I'd like the stream work to be done before a deck because improved access means lower cost. So I have reluctantly decided to delay. I also told the board after three designs that weren't approved that I would not take the time to produce a fourth. More often than not, this is the course of events in this HOA.

Sometimes there are surprises. One thing discussed during the July meeting was a complete reversal by several on the board on an issue that has been a disappointment to me for three years. I was astounded. Several years of stonewalling suddenly vanished. But it took a slide show by me in June to get the point across and allow some board members to become aware of reality. Or perhaps the lawyers are now involved? Can't say. More on this amazing turn of events in a later post.

Wednesday, June 10, 2015

Water Main Finale

0 comments

Bookmark and Share


The water mains were completed, and the one length that needed to be "sanitized" passed the city inspectors.

Isn't it wonderful when the residents pay for all of this infrastructure while the city of Wheaton collects the taxes and fees for permits? You betcha!  Here's a trick question. Do you think the city requires its water or maintenance department to take out a permit and pay a fee each and every time a fire hydrant is replaced? Yet they do in a HOA. Yep, it's all about collecting fees. The city is feeling the pinch as the State of Illinois, aka State of Disaster, aka State of Madigan goes through the throes of its financial death.

I'll probably run a slide show at the HOA meeting tomorrow, so most of the board which was elsewhere for most of this project is kept fully informed.

That's not a criticism. It's a statement of reality. We all have other things to do, and for about 97% of the owners, it is about avoiding HOA meetings, and for about 10% of the HOA owners, it is about avoiding paying their HOA fees.

Isn't life wonderful?


Saturday, May 30, 2015

Water Main Replacement - Observations. One, two, three!

0 comments
One of three mains that were replaced

Bookmark and Share



Three water main replacements are in, of which two are complete. One remains to be pressurized. All in all, the project has gone well. I had some concerns; this type of project has a real potential for breakdowns and problems. While it is useful to be aware of the potential for problems, it isn't useful to obsess or worry others needlessly. Owners who have "issues" with these types of projects should come to HOA meetings and learn  more about their association, and express their opinions to the entire board in a public forum. Owners or residents who simply cannot tolerate these types of problems shouldn't be living here, period.

I took 100+ photos over a period of three days. I'll present some to the board during a HOA meeting.

Digging up existing water mains does pose a problem. For example, we did not know where the building services are tied-in to the water mains. The contractor did not know precisely what would be uncovered after the digging began. We knew this relatively small project would directly impact 28 units (8.3 percent) and could require water interruption for more. Of course, trenching across the main road of this HOA at three locations meant that a majority of our units and residents would encounter traffic delays or would be re-routed at various times as the work progressed. This required additional communications with residents, although residents on Briarcliffe or Harrow Court and even the North-West end of Lakecliffe would not be impacted, or aware of what was going on. In fact, one resident at Dover/Plymouth, on encountering a workman directing that she turn left and "go the other way" on Lakecliffe asked "Can I get out that way?"

That is one of the challenges; residents who don't read the notices that are posted, or the newsletters, who don't know the arrangement of the streets, who don't use "Google maps" or "Bing maps" or the HOA website, or read this blog, and so they are generally unawares. Now, it is beyond the scope of this post to go into the issues faced by an HOA with oblivious owners and unawares residents. Combine this with the fact that 97% of the owners in this HOA don't attend monthly meetings (excluding board members).  You may get the idea that we have a communications problem. But the board can't make people communicate responsibly and reading and attending is part of owner responsibility. Yet, I was told by one owner who had a problem with the water interruption that "he" was "too busy" to read the notices, or newsletter and was unaware of the HOA website. Enough said!

Of course, there are anticipated, tangible benefits to this project. Those benefits are part of the "cost benefit analysis" but I would also say that the potential for "disruption" to residents is also a board consideration. What occurred was what I call "interruptions." I would prefer our residents and owners experience interruptions over "disruptions." Is there a difference? Yes, there is. An interruption is a temporary lack of water. By temporary I mean an interruption during daytime hours, after many have had their morning shower and breakfast and before everyone prepares dinner. A "disruption" is a water outage that lasts overnight, or for days.

An interruption is having to use the other entrance to the complex, or the requirement to move my automobile before 8:00am and then through the day, walk 100 feet because "my" cul-de-sac is closed and my automobile is parked on Lakecliffe. A disruption is closing the street for days.

An interruption is a water main break which occurs and requires that residents use a 5 minute longer driving route, or a requirement to drive to a less convenient parking spot because the road is blocked by workers. A disruption is a water main break in the winter, which freezes, and/or shuts off water for days, and costs the HOA many tens of thousands of dollars to repair, closes streets, and so on.

A disruption to one's personal finances is a special assessment.

An interruption is another three days lost performing my duties as a board member, closely monitoring this project instead of doing my work.

I had legitimate concerns about the potential for interruption and disruption to residents, both because of temporarily closed roads and water interruptions. I expressed these concerns by asking questions about sequence, schedule, duration and shutoff, traffic patterns and control, etc. In other words, I wanted to establish as much certainty as possible, and in asking those questions, determine potential for problems and uncover any hidden flaws in the plan. In doing so, the plan might be improved. This is one of the duties and responsibilities of a board member.

One outcome was revising the official association website to make the "home" page a bulletin board for important notices. The board had discussed this several times, and this was the opportunity for action.

This was also a trial run for the communications and logistics for the replacement and repaving of Lakecliffe from Salisbury/Thames past Gloucester, Dover/Plymouth and to Briarcliffe Blvd. That project is imminent and will occur this year. It will require the use of temporary traffic patterns, interrupt street parking while curbs are being replaced, will close Lakecliffe at various times and will require daily changes to traffic patterns as workmen progress from one end of the street (Thames/Salisbury) to the other. Nor will this be done in "one pass." We'll be dealing with stripping, base and asphalt. Three passes? It will have the potential for disruption.

Doing the street project in 2015 was not part of the "plan" and should not have occurred until 2022. But the condition of the street "is what it is" and owners who complained about a "minefield" on the other end should be pleased; we're averting another minefield.

But I expect the complaints will come rolling in.

Wednesday, May 27, 2015

Lakecliffe Paving Update - Water Main Replacement Underway

0 comments

Bookmark and Share


Replacements Underway - two locations
Water main replacement work began today, as posted and per the "official" association website.

Work is proceeding well, but there is a schedule adjustment. Valves have been installed at Dover/Plymouth and Gloucester and the water is 'on.'  There should be no further water interruptions at those two locations. Actual installation of the new water mains at Dover/Plymouth and Gloucester should be completed tomorrow (May 28).

Work at Salisbury may not begin until later in the day on May 28 and may not be completed until Friday May 29. That is a schedule change. 

Plymouth/Dover

Wednesday, May 20, 2015

Lakecliffe Paving Update

0 comments

Bookmark and Share



This post will be updated frequently with current information.


May 27, 2015, 3:33pm. aWork began this morning at about 7:00am. I posted a seperate update at 3:33pm. The schedule has changed. Anyone who wants current official information should click on the following link:
www.BLMH.org


May 22, 2015, 9:00pm. Management has provided additional information at the official association website. Anyone who wants current official information should click on the following link:
www.BLMH.org


May 20, 2015, 1:00pm. While management works on getting some certainty, the weather for next week is deteriorating. Currently there is a 50% chance of thunderstorms commencing Sunday and continuing through Friday. Sooooo, weather will be a factor and will complicate this project and prevent 100% accurate communications.

Want better weather forecasting? Watch Tom Skilling, who reputedly makes $2 million a year, has a staff of about 12, and seems to have great difficulty getting it right. When the highly paid "experts" can't provide reliable information, what is one to do?

May 20, 2015, 11:00am. We have been informed that the work cannot begin until May 26 or 27. The contractor will then begin working on water mains on the property. Refer to the aerial view and diagram in this post; the red lines are the locations of the mains where they cross Lakecliffe. One main will be replaced at a time. We are awaiting verification of precisely where  the water main work will begin, so that residents are aware of precisely where Lakecliffe will be closed on the first day. With this information residents will know if the South entrance is open and will also know the shortest route in and out of the property.

Hopefully, management will get timely updates out so residents know which entrance to leave from in the morning and how to get back to their residence during the day and at the end of their work day. That's my goal, anyway. Keep your fingers crossed. "Everything can be resolved in communications." But getting firm commitments out of contractors when Wheaton permitting and weather is involved can be a problem. Of course, I've been told by a very few residents that "We don't read your blog" and "We don't read the newsletter." I assume some also won't read the notices posted in their building entrance, either. Here's a reality check. The responsibility to communicate, and communicating responsibility is a two-way street.





Monday, May 18, 2015

Lakecliffe Paving Preparations to Begin

0 comments

Bookmark and Share




South Lakecliffe Paving
This is an aerial view of the section of Lakecliffe which will be repaved. It also shows the crossing of water mains in this section of Lakecliffe.  If all goes according to plan, then Salisbury Court will also be repaved in a few weeks.

On Thursday May 14 the board approved the contracts and work will begin with preparation this week. Preparation will include water mains crossing beneath Lakecliffe as shown above. This will result in closures of Lakecliffe while digging is underway.  The precise schedule and sequence was unknown as of Friday. The plumbing contractor has advised management that the work will begin this week.

Notices were distributed and posted by management on Friday.

Updated information will be relayed as it becomes available. The exact paving schedule has not yet been determined, but could begin in June. Prior to the actual paving there will be a lot of curb work and staking and that will require moving vehicles off of Lakecliffe so the curbs and storm water inlet work can be done.

This will be similar to the project last year and so, residents should be aware of how this will work; after all, we did a similar project last year.

This project is larger is scope than the street project last year. This section of Lakecliffe is longer, more curbing will be replaced and so on.

Sorry for any inconvenience. However, we'll try to get this work done as quickly as possible to minimize disruption. This section was patched last year and we want to avoid another minefield and endless patching. I would think owners would agree, after the experience with the North section of Lakecliffe.

There will be additional information as soon as it is available.

Friday, August 15, 2014

Lakecliffe - Conclusion

2 comments

Bookmark and Share


The Source of Empowerment
What if we each decided that we really, really live here because we choose to, instead of because we have to? That's the source of my personal power. I do what I do because i can, because I choose to and because I want this place, wherever I am, to be a better place and a reflection of choice, rather than something else. It appears this is not the will of the majority. So it is what it is. They will pay the commensurate fees.

I made a choice in 2008 and I decided to make it a demonstration. I have succeeded. What others make of this, or where they take it, that's entirely their personal business. Life is both a choice and an opportunity. What little I have accomplished is a gift. Use it well.

Status
The portion of the street that was repaved is about 99% complete. Signs and equipment have been removed, and there is a section of curb to be replaced, some additional landscaping and that's it. Currently the board is awaiting a review of the material quantities used and so on. This is all "backoffice" stuff and so most of the owners or other residents are unawares, or have no interest.

Problems
One of the problems encountered during the project was the unwillingness of a few residents to comply with notices that were posted, "ROAD CLOSED" signs and so on. To deal with this the construction crews had to dodge vehicles, there was one accident, and I spent numerous hours moving barricades back into position after some @ssholes moved them aside so he/she could drive in.

Bad News
The portion of the street that was replaced represents about 17.5% of the streets in BLMH. In other words, within 5 years the remaining streets will have to be replaced, at a major expense. Some of the base will have to be removed and that would not be required if the streets were properly installed in 2002-2004.

Can street replacement be avoided? No, but it can be delayed. There are two methods available. The most recent, by that infamous board of 2008-2010 was to put their head in the sand and attempt to cut fees, passing the problems and the costs to us, here in the present. The other approach, which I advocate, is to perform preventative maintenance, thereby extending the life of the current streets in a responsible way. That approach will result in the lowest possible annual maintenance costs.

Am I confident the second approach will occur? Not at all. Last night, during an association meeting, while discussing establishing a schedule for carpet replacement, a board member actually made this statement in defense of not establishing a schedule: "In the past, we only replaced carpeting when it became a trip hazard." My retort was "Yes, exactly like Lakecliffe."  That's the really bad news for this HOA. That attitude remains a prevalent one for some owners and some board members. So we will persist in pushing the problems down the road until they become unavoidable and until the costs escalate. Then we can deal with them as "emergencies" and make the really costly decisions. "Penny wise and pound foolish."

The Good News
This is a preliminary estimate, but it seems that the amount of material used was less than that budgeted, and so the cost for that portion of the street replacement should also be lower than that budgeted. However, on ripping up the street it became obvious that the grates for the basins were in poor condition and so all were replaced. That will be at additional cost. On the other hand, we could rip these up one at a time using our maintenance contractor. This would embed the costs in our annual fees, create more seams to allow water in to erode the base and probably cost more in the long run. So what would you have done?

We also got some other good news. If we were today to make the decision to get this street replacement done in 2014, the costs would be about $30,000 more than we are spending. That's about $90 out of the pocket of each owner. In other words, there is a benefit to planning and preparing.

Looking Ahead
The new portion of the street, with preventative maintenance, primarily crack filling, will be here and in good service for 20 years. When it is necessary to replace it, only the asphalt will be stripped, reducing the replacement cost by 50%.

The Really Bad News
This is comprised of two items. The first is, it appears there will always be owners and board members who resist the facts, numbers and so on. They will persist in their ways and the consequence will be money spent needlessly and in amounts higher than necessary. This will also result in higher fees for current owners, both today and in the future, which is when the tab will come due. The second part is about me. I really, really don't have to live here and my spouse and I have done so only because we choose to. I can move any time I wish which is an option not available to everyone here at BLMH. The work I have done for the past  years was a gift. My services will not necessarily continue to be available. Yesterday, when asked if I would continue on the board, I told those present during the association meeting that "I had received a better offer from a HOA in Hawaii." I am undecided. What would you do?

The Future
I look forward to visiting BLMH in 2034 to see the condition of the streets. I'll wager that the north section of Lakecliffe will be showing its age, but will continue to provide good service. Of course, most of those who argue against planning, preparation, programmed maintenance and cycles, or preventative maintenance and so on are also not planning in being here in 5 or 10 years. They most certainly won't be here in 20 years.

In 2034, there will be others living at BLMH and they will probably notice the condition of the streets. Some may notice the condition of the north section of Lakecliffe and compare it to the condition of other, newer portions of the streets of BLMH. They will wonder why it seems in better condition. You and I will know why that is so.

Tuesday, August 12, 2014

Lakecliffe - Asphalt Begins

2 comments

Bookmark and Share

The following were posted throughout the day. The earliest post was at 7:21am and is at the bottom. the most recent is at the top. 

Update 3:00pm - The street has been reopened
The "Road Closed" signs were taken down at 1:41pm. The August 8, 2014 notice posted by management stated "If the "Road Closed" signs are still up DO NOT DRIVE ON THE NEW SECTION OF LAKECLIFFE DRIVE until the signs are removed."  The "Road Closed" signs have been removed.

UPDATE 1:54pm
This photo and the message "BLMH Lakecliffe street is open" was sent to the HOA president at 1:54pm. At 1:55pm this response was received: "Hoo-rah!"



UPDATE 1:26pm
The final paving work is underway.

Surface Course Continues and Dodging Cars 12:53pm
The "ROAD CLOSED" signs and "Road Construction Ahead" signs are at each end of this section of the street. There is also the  "Street Closing set to occur Monday 8/4 - Tuesday 8/12" signs at each end of this section of the street, as well as hand carried and posted notices in each building entrance in the construction zone. Apparently, some of us are "special" and so this certainly doesn't apply to "me."




Surface Course as of 12:46pm

Surface Course at 12:01pm


Binder Course underway 10:40am

ORIGINAL POST 7:21am, August 12
I was at the street at 6:30am for an early meeting, but apparently the decision had been made to proceed. The paving company began arriving at 6:40am and by 7:00am the work was underway.






Monday, August 11, 2014

Lakecliffe - Update Monday August 11

0 comments

Bookmark and Share



UPDATE 5:30pm Monday, Aug. 11
The engineer retained for this project has been in communication with management, maintenance and the board. Here is the current status. 
The application of Prime Coat: Given the rain the project has taken on during the last 24 hrs., the use of the prime coat will not likely have the desired benefits.
The engineer recommends that if the site takes on any more rain between now and tomorrow morning, the prime coat should not be applied. Likewise if it stays dry from now until early tomorrow morning, the prime coat could be applied.
The construction services manager for the engineering firm will plan to be on-site early tomorrow morning to help make this determination. Management, maintenance and a representative for the board (me) will be there for the decision.
Bottom line:  We need to return the road to service.  

UPDATE 3:00pm Monday, Aug. 11 
If it doesn't rain tonight and if it is dry then work will resume tomorrow morning.  However, here is the latest NOAA.gov weather prediction at 2:52pm:

Tonight: A 50 percent chance of showers and thunderstorms. Patchy fog after 4am. Otherwise, mostly cloudy, with a low around 63. Light west northwest wind becoming northwest 5 to 10 mph in the evening.
Tuesday: A slight chance of showers before 1pm. Patchy fog before 7am. Otherwise, cloudy, then gradually becoming mostly sunny, with a high near 74. North northwest wind 10 to 15 mph, with gusts as high as 25 mph. Chance of precipitation is 20%.


UPDATE 9:08am Monday, Aug. 11 
It's official. Work will not resume today.

ORIGINAL POST 7:30am Monday, Aug. 11 
Thunderstorms entered the area at about 2:00am. Intermittent rain is to continue today and tonight.

No word at present as to when work will resume and the paving completed on north Lakecliffe.

Sunday, August 10, 2014

Lakecliffe - Update Sunday August 10

0 comments

Bookmark and Share
UPDATE 12:40pm, Sunday Aug. 10 
Over at Weatherunderground.com they say there is currently a 90% chance of a thunderstorm tonight. That could delay the paving. However, at present there has been no indication of a change in schedule and all residents in the construction area should plan on work beginning at 6:45am or possibly earlier. If rain does not arrive tonight, Monday morning could be a mad dash by the paving contractor to beat the rain.

Attempting to get certainty with the weather is very difficult. For example, here is the NOAA official weather forecast for Wheaton IL, last updated at 11:52am:

This Afternoon:   Mostly cloudy, with a high near 83. East northeast wind around 10 mph. Tonight: Mostly cloudy, with a low around 66. North northeast wind 5 to 10 mph.
Monday: Showers and thunderstorms likely, mainly after 1pm. Mostly cloudy, with a high near 82. North northwest wind around 5 mph. Chance of precipitation is 60%. New rainfall amounts between a tenth and quarter of an inch, except higher amounts possible in thunderstorms.
Monday Night: A chance of showers and thunderstorms. Mostly cloudy, with a low around 63. Northwest wind 5 to 10 mph, with gusts as high as 15 mph. Chance of precipitation is 30%.

UPDATE 3:30pm, Sunday Aug. 10 
This Afternoon: Partly sunny, with a high near 83. East northeast wind around 10 mph.
Tonight:  Isolated showers between 7pm and 4am, then scattered showers and thunderstorms after 4am. Mostly cloudy, with a low around 66. North northeast wind 5 to 10 mph. Chance of precipitation is 40%.
Monday: Scattered showers and thunderstorms. Mostly cloudy, with a high near 82. Light north wind increasing to 5 to 10 mph in the morning. Chance of precipitation is 50%.

Friday, August 8, 2014

Lakecliffe - Update August 8, 2014

0 comments

Bookmark and Share
UPDATE 4:00 PM, Friday Aug. 8. Notices have been posted in the foyer of each entrance in the construction zone. Residents should read the notices and comply. The street is closed for the weekend and cars will be towed.

Original Post 9:02AM:
Notices were posted yesterday, Thursday August 7 by management at the buildings in the construction zone. This provided the latest schedule information, information about trash pickup on Friday (today) and so on. Currently, the northern section of the street is closed until all construction is completed. Residents in the construction zone are being instructed that they can drive in only after the "ROAD CLOSED" signs and barricades have been removed.

The "Construction" signs were updated this morning. At 6:00am, HOA maintenance workers and myself were on hand to make sure trash and recycling vehicles had access. Trash and recycle bins were carried to the street and then put back on driveways for those addresses with dug-up drives.

At 7:00am, construction resumed.

At 8:30am the construction signs were updated with the latest information. The north section of the street will remain closed through the weekend. Paving is to occur on Monday.

Newsletters were distributed to the north half of the property yesterday evening.


Saturday, August 2, 2014

Lakecliffe - "Convergence"

5 comments

Bookmark and Share
con·ver·gence
kənˈvərjəns/

"The process or state of converging. To converge is to come together from different directions so as eventually to meet."

For this HOA the state of Lakecliffe Blvd was the result of the convergence of many dynamics within BLMH. Some can be traced to decisions made over decades. Some recent boards refused to make a decision and passed the problem to the current board.  The failure of Lakecliffe didn't "just happen."

But the reader might be inclined to take the position that with the completion of the replacement of this section of this street "It's over." Ah, yes, let's just "move on."

Is it really over? Some infrastructure issues are being slowly addressed and yes, an additional eight roofs are scheduled to be completed by fall. However, other streets are showing the same danger signs as did north Lakecliffe in 2008-9. While it is true that the current board has taken the steps for a serious engineering analysis of the streets in 2014 and a reserve study update to incorporate the findings of the study, it will be entirely up to future boards to deal with this and collect and spend the money. Future boards will have to decide what to do, when to do it and by whom. There is no guarantee for a good outcome.

In the recent past, some boards were incapable of doing this. Lakecliffe is a consequence.  There are other consequences, some remain unconcealed.

A question for future boards is this. Will the new streets be maintained, or not? With the completion of the roofing project will reserves be put aside each year earmarked for roofs and allowed to accumulate for 20 years? Or will the boards decide to pass the hat to future owners? It happened before and it can happen again.

Whatever future boards do, there will be consequences. So what converged to get us to this place in time? Here are a few factors to consider.

Conclusion - Provided here for those who want the executive summary
When things go wrong it's easy to look for simple answers. When an aircraft falls from the sky, the experts say that it is usually the consequence of mechanical failure and pilot or other human error. There is no one, single cause and human beings are usually involved as the decision makers that led to that aircraft failure.

So too with HOAs. When things go wrong some owners come to the then current board as the simple answer.

When serious infrastructure problems occur, it may be easy to point the finger at a construction company or builder, or a board, or a manager. I think its reasonable to say that these types of failures are the consequence of the complex interaction of people. People make decisions in a HOA, not one, but many and over a period of years. Those decisions determine fees and how and when they are spent. Those decisions require establishing priorities and allocating resources. Property managers and boards are not project managers, engineers or construction managers. Some management firms may include such individuals but that is not the skill set of the property manager. But memories are short, and when certain problems occur, then some owners will say "How did this happen?" Frequently it is the same people who promoted a certain course of action. Owners are an intrinsic part of the decision making process. Owners elect the boards and it is the owners who press to achieve certain results, including reducing fees.

In this post I've provided a scenario which presents Lakecliffe as a convergence of good intentions and some less than good decisions. Taken singly, each decision might seem reasonable and should not have resulted in failure. Each decision can be argued on it's own merits and has been, by numerous boards and a variety of board members. I suspect no one single decision made after construction resulted in the current condition of the street. Instead, a series of events, some of which began years before this street was installed all converged. Those events included finances commencing decades ago, the design and installation of the street, some long held beliefs about how to maintain a HOA, and beliefs about how to keep fees as low as possible. One factor was the conflicting demands and expectations of owners, and the attempts of various boards as elected representatives to satisfy the owners. Another is the capabilities of volunteer boards. Another is chronic staffing issues.

I am of the opinion all of the decision makers did so with good intentions. I suspect there was no overwhelming desire on the part of anyone for this street to fail. But fail it did. What do I mean by "fail?" I mean the early and premature expenditure of a lot of money to replace it. That's what I mean by "fail."

What were some of the contributing factors? Owners have pressed and complained about high fees for as long as I have been here; certainly since 2001. In 2008 the owners made it a point to put in place a board to correct that. Over decades a variety of boards made decisions to avoid spending money needlessly. The definition of "needlessly" varies from board member to board member. Each owner has a different definition of "essential" spending, but it is generally true that money spent for maintenance of "my" building, patio, walks, driveway, garage, lawn, etc. is money well spent. Design sometimes occurs in house, rather than by licensed professional engineers; there is a place for this, but the street should not one of them. Project management occurred in house. There is a place for this, but the street should not be one of them. Preventative maintenance did not occur, but spot patching and then larger patching did occur. Boards were slow to respond; this is inherent in the structure and makeup of volunteer boards, as well as the frequency of HOA meetings and a requirement that all such meetings be held openly. Replacement was delayed in an attempt to reduce expenditures and reduce owner fees. The street did not cooperate and failure accelerated. Boards were sidetracked by other issues, both social and substantive. In 2008-2012 Lakecliffe was not considered to be an emergency, and in 2008-2009 it was not even considered to be a problem worthy of discussion. In 2009-2010 it began as a nuisance. It was eventually elevated to the status of an inconvenience. By 2012 a realization of possible failure became a consensus, but catastrophic failure did not seem possible. We'd undergone a change in management and the board and most were baffled. After all, this street was supposed to be okay until 2021 or so.

The question to be asked is "What can a HOA do to avoid this type of situation?" Lakecliffe serves as a beacon. It provides an opportunity for change, and it can be used constructively to build a consensus that some change is really necessary. Not the political buzzword Change, but rather a shift in perspective, the way problems are approached, the way tasks are prioritized, the character and composition of boards, the delegation of duties to property managers, the proper use of professionals, and the role of owners. Most of the owners in this HOA have regularly paid their fees. Some boards had members who did the same, showed up at meetings and merely cast votes as their primary duty. Some change really is necessary. There is absolutely no consensus that it should occur and no one is empowered to make it happen.

There are many other infrastructure and organizational issues. They simply aren't as visible or obvious as Lakecliffe. Boards are comprised of micromanagers with a different emphasis or focus for each board member.  Programmed, cyclic replacement is frowned upon, with the painting program as the one unique and repetitive, guaranteed task at BLMH. Micromanagement supposedly reduces overall costs.  It also delays replacement, prevents certain maintenance such as streets and driveways and garages and even sealcoating and carpet replacement. I suspect it supports a "squeaky wheel gets the grease" approach. There has been a slow transition, but it is an uphill battle. Without a programmed approach, new boards are likely to drop out entire tasks, and they do.

It is my opinion that a variety of boards have accomplished quite a lot at BLMH since 2008. The pace has accelerated since then. However, it is also true that our infrastructure is aging and with that age there are additional problems becoming visible. Our reserve study does address the infrastructure issues, but cannot determine the lifespan of our water mains. However, there are some things that can be done to get a better grasp on that. The completion of the street analysis by a professional engineering firm will be important for updating the reserve study. The current status of driveways, garages and roof projects will also be incorporated. Future boards should have a much superior tool as a guide. However, it is up to the boards to decide to use that tool. Perhaps it is time to turn more of this over to professionals and fund a full time manager. Boards can be more involved in identifying problems, cost centers and fund sinkholes, figuring out supplemental sources of income, or social issues and keeping owners happy.

But a variety of owners are distrustful of the boards, managers and maintenance. Owners don't like the disruption caused by the infrastructure work. The pace has quickened and for several years it seems whole areas are a construction zone. This is a consequence of a promoted plan to delay such work for as long as possible, the acceleration of certain problems including aging roofs and dying trees, unforeseen events and Lakecliffe, and the game of  "catch-up."  There is a price to pay for delay and we today are paying it.

All owners really need to get a grip on financial reality.  Our fees are not going back to $175 per month, unless future boards find other sources of income and return to a day when adequate reserve accumulation was for future owners to accomplish.

Is real change necessary? Possibly not. This HOA got to this point and various boards dealt with all kinds of issues. How will we pay for this street replacement? Simply delay other work. So why should we change? Consider the age of this complex, consider the fact that infrastructure is failing,  be it streets or water mains or even the entrances, mail boxes and garage floors. Even the lakes pose a problem, but we are tied to Wheaton about that and our "tax and spend" neighbor COD. Nevertheless it does need to be addressed.

Consider the age of the board. Change is coming. It will be the decision of all of the owners if it is to be a transition or another series of costly disruptions. We all have decisions and choices to make. Make them well. If we do that and with a little luck and by the grace of God, our fees might actually improve and we might get better results.

Was it because of original design flaws?
BLMH has struggled for nearly 40 years dealing with and correcting design and construction flaws. These include roofs, patios, streets, garages, streams and ponds, and most recently owner fireplaces. Today the fireplaces have become the centerpiece and a primary concern for some owners. Some forget or prefer to be oblivious to the fact that the board owns units and we too have our personal fireplaces to deal with.

For some addresses the elevation of the buildings relative to the street is an issue. Some buildings were built so low that water could not flow properly to the streets. Any impediment, such as a thin layer of ice or snow, or even severe downpours caused a problem. This has required extreme diligence during any driveway or street repairs to assure that water flows from roofs to driveways to the street and then into the storm sewers. It has increased the cost of repairs, and the cost to maintain. Some driveways must be kept clear of all ice and snow. BLMH was built in such a manner as to be expensive to maintain. Some boards fail to observe this, and some have chose remedial action over correction because it appeared to be the lowest cost approach. Or perhaps the approach with offered the lowest immediate cost was chosen. However, it is not practical to solve some of these problems. The best situation possible is achieve the longest possible life at the lowest annual cost over the life of the structure, road, etc.

Was it because of construction defects?
Lakecliffe was reconstructed in [2002-3]. At the time, project management was accomplished in-house by property management. I have never seen the construction drawings and so I cannot state if the curbs and street were installed in accordance with the plans. An inability to produce drawings when asked has led me to question if they existed; the lowest cost approach would be a specification to replace in kind. It seems a properly qualified, insured and bonded engineering firm was not retained to prepare plans and specifications.

What we have recently determined is the thickness of some sections of asphalt were abnormally thin. The slope or pitch of the street and the crown was less than recommended guidelines. The street was rolled to the arrangement of the curbs and several areas of these could not provide the needed slope. A layer of "petromat" was installed between two courses of asphalt, the topmost of which was sometimes too thin. All of these factors combined to create a street which failed prematurely.

Knowing what happened has resulted in a more costly project. It was initially thought (by me in 2009 and as an owner) that we could simply strip asphalt and put in a new course.  As the disintegration of the street progressed, even with large patching of sections, it became apparent to me that simple asphalt replacement would be insufficient. BTW, in discussions with engineers, etc. I have NEVER revealed my personal opinions. Doing so could have influenced the result of any study, analysis and so on. What I have done is set a desired outcome; specifically "What do we need to do to achieve a street that is capable of normal lifespan with nothing more than normal maintenance?"

The current project is considerably more elaborate than simply peeling and replacing the asphalt, and will cost more than my $100,000 estimate performed as an owner in 2010, provided to that board and promptly flushed.

Was it because of insufficient funding?
It's useful to look at the street from the perspective of a board in place in 1998-2001. Consider the state of HOA finances at the time, the absence of a formal reserve study, and the complaints of owners about "too high fees." So what would most of us do as an elected, volunteer board comprised of ordinary owners in those circumstances? Would we spend thousand of additional dollars for surveying, plans, specifications and project management? Would we hire an independent testing lab?

This HOA has struggled for most of its existence with a variety of funding issues. Early fees began far too low for a 40 acre complex with numerous start-up defects and issues. Those fees did not include any provision for adequate reserves. Paying for the daily bills and some major breakdowns was the major issue. Is it a wonder that today some owners prefer a lack of financial planning and preparation? Is it any wonder that boards were elected and put into place because they refuse to do such planning? Paying the bills each month via the checkbook is the minimum standard. It worked before, didn't it?

Here's an example. The first bona-fide, unbiased reserve study was conducted in 2011, 37 years after construction of this HOA began. [After construction of BLMH there were] several periods of see-saw fees which created financial issues and stress for boards and owners. One prevailing attitude and accepted operating principle which emerged was "If we don't spend it we don't have to collect it."

There appears to be a belief that "Our fees are too high." This was most recently stated to me by a board member while we were observing the Lakecliffe reconstruction. I found that to be ironic. We're ripping out a street 12 years after installation and which I identified as failing only 6 years after installation and our fees are too high? I wonder what contributed to that opinion? Of course, no one ever comes up with a viable solution for permanent fee reduction. The prevalent approach has been to reduce fees now and let future owners deal with the consequences.

Some owners have preferred boards which will defer spending while attacking other boards in a crude attempt to have funds diverted their way. This provides the best of both worlds. "My fees are lower but I get the benefit of higher fees were such benefits provided to each and every owner." Their rallying cry became "What do I get for my money?" Some boards apparently supported this with a "squeaky wheel gets the grease" approach. In other words, only if there is a forceful complaint will certain problems be dealt with. That approach does create a problem as the word goes out. Eventually, owners get the word via the club or whatever and so the playing of the game expands among the owners. However, most of the money spent in such appeasement was nickle and dime. It's certainly easier to pour a section of walkway than to plan for and deliver the replacement of streets, roofs, 336 patios and decks,  84 garages, 84 entrances, 800 trees or water mains.

Boards contributed by avoiding certain expenses, such as failing to hiring engineers for certain projects, failing to assure  adequate supervision and failing to have a professional construction manager present for the street project. This would be expensive and of course, we got by without this in the past. But did we?

Was it because of a lack of reserves?
By 1999 the reserves were a shambles. In the first 37 years of existence, this HOA had never had a formal reserve study. In 1998-1999 a new management firm was brought in and boards were evidently made aware of the problem, as fees began to continuously rise each year as reserves grew. However, it didn't take long for owners to complain. This was a departure from the normal which was not communicated by the boards. The newsletters of that period don't give a hint of what is to come, or the long term financial goals of board and management. By 2001 owners were complaining "our fees were too high."

Was it because of a lack of planning or maintenance? 
In 1999 this HOA began ramping up fees. Apparently the new management had a different perspective about reserves. Streets were replaced several years later and reserves began accruing again for the next street replacement planned to occur several decades in the future. No program was put into place to maintain the streets, beyond patching any hole that might appear, a collapsed basin, etc. Six years after completion, in 2008 the street was identified by an owner as failing. This did not fit the financial plan. By 2010 street patching began and the street was identified by an owner as requiring $100,000 within 5 years. That however, did not fit the financial plan. In 2010-2011 board discussions about performing street maintenance, including crack filling were tabled. A manager argued it wasn't necessary and the board was disinterested. Besides, such maintenance wasn't in the budget. By 2011 an unbiased reserves study was made. It too indicated a street replacement in 2021 or so, based solely on the installed date of the street, not the current condition.

Finally, a board did authorize funds for an analysis of the street. It confirmed what was already known, but difficult to believe. The street was gone.

Was it because of resistance to programmed maintenance cycles?
At BLMH most, but not all maintenance is accomplished as needed. There is no regular preventative maintenance program for any of the asphalt surfaces in the HOA. That includes streets and driveways. At present new driveways are being seal coated within two years of replacement. Beyond that there is no plan in place for future seal coating or crack filling.

One area of difference in which there is a regular cycle is the painting of the buildings. Interior halls and the exteriors as well as structures (lampposts, gazebo, etc.) have wood replaced and are painted on a regular basis. This was every 5 years, but recently a board agreed to change this to a 6 year cycle so that the same number of entrances and exteriors are done each year. This change will smooth annual expenditures.

However, just about everything else at BLMH is not maintained as a cycle. Hallway carpeting is to be regularly replaced according to the reserve study, but it is not. It would be very easy to do this in tandem with the painting cycle, but one year later. Same for sealcoating of driveways and certainly for street preventative maintenance.

Is there a financial advantage to avoiding cycles? Apparently there is a belief that delaying maintenance "as long as possible" will reduce annual costs. This was the argument used for delaying roofs. There is another advantage. Some things will never happen because there is no directive given to perform that work. Ultimately, some repairs will grind to a halt. I can provide a list of such repairs for anyone who will listen and I do bring this to the attention of boards each year.

Is there a disadvantage to avoiding cycles and using a buffet approach? That's an approach where maintenance issues are laid out on the table and a board picks and chooses? One glaring problem is simply this. Unless a board issues a directive each and every year, then some things will never occur because they may never be placed on the table or if it is a list, some items may never come up to the top of the queue. In other words, certain repairs will simply be "dropped out" because there is no instruction to perform them. In combination with board turnover, this means that some things simply never happen because they are forgotten. Other, more pressing issues will displace many attempts to move some items to the top of the list.

There will always be breakdowns or owner upsets. These can overcome boards. In recent years there has been the COD expansion and creation of a dumping ground on our east property line, flooding in South Wheaton, disruption caused by new roofs with gutters and downspouts, other drainage issues, an IDNR dam permit, owners fireplaces, delinquencies, foreclosures, board turnover, etc.

Boards seem reluctant to do programmed maintenance. Would regular maintenance of the streets contribute to a longer life?

Was it because of staffing problems?
BLMH has been professionally managed for about 15 years. Prior to that time it had a single manager, but financial systems were manual, etc. For approximately 15 years it has also had professional maintenance. Boards are chronically understaffed and there is currently one board member for 56 owners. At various times some board members have had no assigned duties or responsibilities, other than to attend meetings and to vote.

Other issues have diverted boards. These include dealing with delinquencies, bad debt, owner fireplaces, a flood in south Wheaton, IDNR issues with the lakes, board issues with Wheaton's control of the lakes, 15 or more water main failures, owner complaints about COD, other projects, drainage problems, roofing, garages, patios, streams and pumps, common area patios, etc. Let's not forget owner personal issues, which at times occupied 1/3 of entire HOA meetings. Then there are the "simple" day to day operations.  Simply keeping this behemoth running and paying the bills are the areas in which a substantial amount of the HOA director and management resources go.

As BLMH approaches 40, infrastructure issues have taken center stage.  The roofing reconstruction project ran into a serious problem because of a failure to handle water flow created by the installation of new gutters which diverted flows and flooded some units. In 2008 a new board either wasn't aware of this or ignored it. For whatever reason drainage improvements didn't occur for several years, creating a backlog of problems and some unit disruptions. Of course, owners demand these problems be dealt with "immediately if not sooner."  One board in particular decided in 2008-2010 that what was really important was the replacement of management and the maintenance company. For good measure it was also decided to rewrite the rules.

BLMH has the same number of board members as a HOA with 20 units. In fact, some much smaller HOAs have fully staffed boards. BLMH does not. Yet, in recent years we have had a webmaster, a communications director and at least one board member with no assigned duties.

BLMH is a complex PUD. It is considerably more difficult to manage than a couple of town homes. The board is a working board, not some group of political figureheads. Some recent board members have thought otherwise, as have some owners.

We do have a professional management company, but we don't pay for a dedicated, full time manager. Nor have we done so for about 16 years. Doing so would result in higher fees, and we can't do that, can we? We have a few amateurs on the board to do these tasks. "Any money we don't spend is money we don't have to collect" as fees. Penny wise and pound foolish is the expression that comes to mind.

So six people like me spend hundreds and thousands of man hours keeping this place running. What a way to run a business! Is it surprising that this HOA has maintenance issues? Frankly, we're doing damned well considering the impediments.

Was it because of board turnover? 
Every new board has to come up to speed. Every new board member has to begin the arduous journey of comprehending just what is going on here. Most new board members are not prepared for the task at hand. Running a election campaign is easy. The problem in this HOA is that board members are working members. We're not simple figureheads who rubber stamp management's activities. We design and direct. Boards literally create the future. Our actions will determine the condition of this HOA 5 years hence, and the fees in 10-20 years. Could this have been a contributing factor to the failure of Lakceliffe? During the last HOA meeting, while discussing the costs of hiring a project manager to oversee the replacement of Lakecliffe, a board member objected and stated to the entire board and specifically to me "You could do this, couldn't you?"

With board turnover it's like the movie "Groundhog Day" and every year there is an election and then we may begin anew. Unlike the movie, the new board members don't have the benefit of prior knowledge. The election is a reset. It may provide the opportunity for mischief. As a board member I'm a fiduciary? What's a "fiduciary?"

A few years ago I prepared a document several pages in length to provide candidates and new board members an understanding of reality. Boards have been hesitant to use that document. I'll publish it here in a few days; perhaps it will serve another HOA. I don't do these things because I need a hobby. This is serious business and a lot of owner money is at stake.

Was it because the board is overwhelmed with minutia?
Discussion of owner fireplaces has been going on during just about every HOA meeting since the fall of 2011. Owners bring a POD on the property and put it in a driveway with no protection under the steel rails; they don't even notify management. Satellite antennas get in the way of building exterior maintenance or magically appear. Asked to correct that the owner response might be "You can't tell me what to do and I'll sue you." "The stream is not running"  "There are mosquitoes on the property" etc., etc., etc. Many owners demand hourly response and resolution.

Every project that becomes delayed joins a long list of "priority" tasks which increasingly absorb management and the board, as we strive to meet the needs of the 330, and to move this forward and retain perspective. Some owners could care less. Some apparently revel in creating disarray and diverting the board. for a very, very few the thinking seems to be "I paid my $300 and I will get my share." Some owners park habitually in "no parking" zones. Some owners bombard management and the board with phone calls or emails about their personal landscaping issues. Or mosquitoes or standing water or the street or a pothole or dust or COD or whatever.

From time to time some board members give up. Our HOA has had zombie board members; they are the walking dead. That is a problem because there really are some priority tasks, rules should be upheld and money needs to be spent to deal with issues, such as Lakecliffe. Progress needs to occur each and every month. If not, we fall behind and that creates additional problems and board stresses. Do we have unlimited maintenance resources and budgets? No we don't. So deferring maintenance piles on the hours and the costs. But the attitude seems to be "Some future board can deal with that." WRONG!

Apparently, for anyone driving south from Salisbury, Thames, Gloucester, Dover or Plymouth the replacement of north Lakecliffe really isn't a big deal, is it? After all, "only" 56 units have been directly impacted. That's less than 17% of the units in this HOA. Anyone living in the impacted area would feel differently. I live in that area. But as one owner who lives on Thames said last year with respect to a problem on north Lakecliffe, "It's no big deal." Yeah, right. And on Monday when cars are parked in every single available space on the propery, some of the residents will view this as an imposition and an inconvenience. The "social group" said "We're all neighbors." The replacement of Lakecliffe is another opportunity for the residents in this HOA to "walk the talk." However, for some residents and owners, that's something for only the board to do.

Looking beyond the problems of the 17% impacted by the street replacement, the board is also dealing with the issues for the other 83% of the owners. When each of us is the center of our little universe of problems, we each demand immediate action. Some boards have operated that way. "Give the grease to the squeaky wheel and ignore everyone else." I don't operate that way. Each owner is an equal.

Was it because of board failure to plan and prepare?
Boards are staffed by owners. Some owners never studied this HOA prior to running for the board. Some owners don't understand the duties and responsibilities of a board member. Some don't know what a fiduciary is.

Some have never read the governing documents. Or perhaps they did at the closing 10, 20 or 30 years ago. Or perhaps they relied upon their attorney.

On joining the board, there are two choices facing an ill-prepared board member. Simply float, show up at meetings and vote. or do absolutely nothing. One good approach is to repeat the statements of others during HOA meetings. "So let me understand this, you are saying that ........."

Some can't read a balance sheet. Some don't understand the reserves. Some don't understand this HOA is a PUD.  Some don't know what a PUD is. Some don't know what the difference is between operations, maintenance and capital spending. Some have difficulty with arithmetic.

Some choke when they see a bill from an attorney, engineer or whomever for greater than $100 per hour. Some go catatonic on seeing an invoice for $10,000.

Some have no available computer technology, or don't have easy access to email. Some have never built or used a spreadsheet. Some don't have a digital camera. Some don't have or use a cellphone. Some apparently can't balance a checkbook.

Owners, on achieving status as a board member will operate on the board as they do elsewhere in their lives. Some owners may struggle financially and they bring that with them. Some don't budget. Some have little or no savings. Some have no financial plan for next year. Some have no long term retirement plan. Some think that furnace will last "forever" and so should the streets, entrances, and so on. Some don't understand maintenance, or practice it at home. Preventative maintenance is a completely foreign concept. Some see rules enforcement as repression. For some, the most difficult thing they ever planned was that vacation on a cruise ship.

Was it because of the culture of BLMH?
Boards are created by the owners. A very few owners step forward to serve on the boards and some are elected to do so. The attitudes and beliefs of the owners determine the character and makeup of the boards. Every owner gets to vote. Only the motivated do so.

This HOA has some owners who have lived here for 20, 30 or more years. Many of them have never served on the board. Some remember the "good old days" when fees were much, much lower. Some owners got burned by purchasing at the height of the residential real estate market. Some discovered their newly purchased unit had a defective fireplace. Some hold that authority figure "the board" in utter contempt as the source of all things bad at BLMH. A few play a game called "Give me what I want and I'll go away for a few days."

It's taken an amazing amount of hard work by a small group of volunteers to get this HOA where it is today. Frankly, some boards obviously did an extraordinary job in the face of very difficult circumstances. I'm amazed by some aspects of this HOA, even today. From time to time I suspect board burnout has occurred. I say these things because I've studied this HOA in great detail.

Not all owners agree. Some have no idea of what it takes to run a HOA but they "know" that our fees are too high, they "know" that there is enough money, they "know" money is wasted, they "know" that the board is incompetent, some promote the idea that there must be fraud, and they "know" that a few handymen could keep this place going, and to paraphrase one owner "My cousin has a pickup truck and he would do a much better job of snow plowing at lower cost." They also "know" that any neighborhood realty firm could do a better job of professional management of this HOA.

Too many owners don't want to know the bad news, be it "foreclosures," "delinquencies," "budget issues," "rental percentages" or water main failures. Some want to avoid the bad news because they construe it to mean higher fees, which they dread. Others view this to be an apartment complex.

Some see rules enforcement including late fees as punishment or board repression. Some delinquent accounts have viewed the board as the enemy. Some view any board member who refuses to vote for lower fees as the enemy. A vocal few see BLMH as primarily a social organization and to this day a few think it should be a philanthropic organization in which they, of course, would be the beneficiaries. Others promote the HOA as "primarily a retirement community." Until recently many apparently didn't know or understand that this HOA is a Private Urban Development in which we own the water mains and the streets.

Some owners resent that their fees are spent elsewhere on the property. "It isn't fair that my fees be spent on that stream repair and bridge replacement on Thames."

Was it because of owner or board complacency?
Is it important for owners to vote and attend annual meetings? Should the owners study the candidates and then vote or is it better to sign the proxy ballots and say "Just fill in the votes for me, would you?" What's a minimum level for owner participation (casting their own votes) in the elections in a "healthy" HOA? Would you say it is 25%, or 33% or 40% or 50%? Would a higher percentage be better?

Some owners say "I paid my fees and I have done my fair share." Okay, and by that yardstick the only thing a board member need do is show up at about 8 meetings a year and vote. Don't read the management packet, don't prepare, don't do anything. Simply pay your fees and come to the meeting and do your duty. In fact, in recent years that is exactly what some board members apparently did.

Owners may view living at BLMH as owning an apartment which should appreciate in value. Some view fees as something optional, because as we all "know" the money is wasted. Therefore any dollar I give to the board is going to be wasted, isn't it? [The money doesn't go to the board or to management, but some owners hold it that way. It's easier to play games when one can direct their anger at the board and management.]

"It doesn't matter who I vote for." A significant number of owners just don't bother to vote during the annual elections. After all, we have a manager and things just get done; it's magic. The best candidate is one which promises to lower my fees; that's all that really matters.

Many owners seldom attend a HOA meeting and that includes the annual meeting.

Some owners have insisted that they don't read the newsletter. As for this blog, it would be used as toilet paper but for the fact it would cost money to print it.

Some owners don't have the slightest idea of what the board does, other than spending money and enforcing the rules. Apparently the board just approves the checks and collects fees. Some owners view the board as personal servants and the management as part of the concierge service. As one owner angrily complained to me "I'm a customer and I demand that you do [blah, blah, blah]. "

At BLMH with 336 owners, some apparently have the attitude "If I don't pay my fees this month, it's okay" after all, there are 335 others and we all know the HOA "has enough money."  Anyone who looks at the bank statement know that. After all, what will this HOA do with that $1 million dollars besides waste it?

Was it because board members may believe "If we don't spend it we don't have to collect it?"
That is really not a good way to run a business. But it sounds wonderful. Combined with a lack of preparation for HOA meetings, all that the board member need do is show up and create delay or vote "No."

This is so easy to do, this ploy is the "swiss army knife" for the obfuscating board member. Don't like a project? Ask for more study, or more research, or more plans. If that fails, just delay it a month and perhaps somebody will forget or recent events will overshadow it. When the task is again brought before the board, delay it again, and again and again.

There exists an even better ploy. Don't allocate any money for the current task before the board. That forces the manager, or the board member or whomever into a place where it's all a matter of their opinion. They can make those plans, sketches or whatever, and then we can ignore them next month, or throw up another barrier.

To deal with management, simply discredit the manager. Then no one is the expert. Voila' The problem solved! We can avoid spending any money outside the regular Operations & Management budget, which was previously approved.

Was it because of "Wild goose chases" and "Snipe hunts?" 
If all else fails, create diversions to keep board members busy. For example, "Norm, we think it would be best if you checked all of the clothes dryer vents on the property."

If that doesn't work the delaying tactic can then be employed. If these techniques are applied in tandem projects can be delayed and money saved, for years.

If all else fails, have a few owners come to the meeting and assail the board with their complaints. That is sure to derail the discussion and the spending.

If there is one thing most owners might agree on it is that Lakecliffe really needs to be fixed. That's not the way it was viewed a couple of years ago. Another benefit is it does give some of the chronic complainers something substantive and real to complain about. In this case, it has actually supported the board in taking positive action.

Was it because of the unrealistic expectations of owners?
Boards and owners sometimes think that things should happen immediately. Some owners see a big check balance at the HOA and they say "What do we get for our money?" In other words, in the event of an owner personal issue the money is there so the board should spend it. There are mosquitoes on the property, there is a broken slab of sidewalk, there is standing water over there, I want new grass, etc. etc. etc. These are trivial amounts. True, they do add up, but who tracks these? No one. Get it into the work order system and get the board to approve it and voila' it's a done deal. Management is empowered to spend a small amount and the savvy and the selfish know that. It's all about playing the game to one's personal advantage, and some owners do just that.

If management were not so empowered, it would be impossible to deal with a lot of the simpler maintenance tasks in fewer than 45 days. Why? Because every task would have to go before the board. With a board meeting approximately every 30-60 days, that would determine how rapidly a HOA could respond. More complex tasks do in fact, require a minimum of 45 days because there can be no board authorization to proceed. Emergencies, such as water main breaks are an exception.

For larger projects, the boards just don't say "Hey, Mr. Manager, get a specification and have that street replaced next month." Well, some might. We don't need drawings and specifications, or we can't afford them. So just hire a contractor. Now, that might be okay for some projects where the contractor has specialized knowledge and proven skill. So how can we tell the difference? When should we spend the money for additional expertise and when should we not? Is it prudent to go for bids? What's the complexity of the work? Why be concerned; if or when it goes wrong, a future board will have to deal with it. But we are a nation of gamblers, so we know we'll win.

Let's be real, shall we. There is no "all knowing and all seeing board." Each member is an elected volunteer and each is merely doing what every other owner should be doing if they were in that seat. The Illinois Condominium Act implies we are each fully qualified.

Was it because of a lack of courage and vision?
Making difficult decisions requires courage. The courage to take on a challenge and in the face of adversity to take the necessary steps.

HOA boards are comprised of fiduciaries. Fiduciaries act for all of us, not for some of us. Fiduciaries accept the challenge and take the steps to acquire the necessary education many of us won't or don't. Fiduciaries take on the challenge of dealing with a myriad of problems most of us won't or don't.

It takes courage to make difficult decisions. It takes courage to identify unpopular challenges and take them on. It takes courage to look ahead 20 years and operate for all owners, both present and future.

Some board members cannot do this. Some won't do this. Some see themselves as the consequences of a popularity contest and have the well being of the entourage as the desired goal. It is really difficult to make decisions that are unpopular for that group.

Each and every day, and with every decision, board members are required to have courage. Courage and vision.

Was the problem with Lakecliffe the consequence of a failure of courage and vision?

Was it because of board reluctance to spend money?
Boards are reluctant to spend money. Some actually freeze at the thought of spending $10,000. Others are aware that every single dollar in those bank accounts have been allocated. Therefor, shifting $100,000 as a consequence of anything other than a dire emergency is not something taken lightly; that sum represents $300 or more from the pockets of each dues paying owner. These decisions are darned difficult.

Each and every board member is concerned by the answer to the question "What will be the consequences of an unplanned major project?" However, running the numbers is sometimes a foreign concept for board members. Some will freeze with the thought "What if we make a mistake?"

So boards may prefer to delay until the last possible moment, or until the timetable and even beyond. Sounds like a valid strategy, doesn't it? Wait until just before that street collapses, or that roof leaks or that tree falls. Then get into action and spend the money. This will keep the reserves as high as possible for as long as possible and it will reduce fees? However, this so stresses management because there are a lot of other things to do including water main breaks, for example, or a foreclosure. Legal meetings and true breakdowns will take precedent. It will stress maintenance and the maintenance budget. We don't have an unlimited army of workers here, do we? It stresses boards because BLMH is like the Titanic and changing direction quickly is at best difficult and at times, impossible. Is it any wonder a HOA may skirt from from iceberg to iceberg?

Boards, being part-time volunteers aren't available 24/7 (Although some owners expect that). "What do we get for our money?"

When a consensus is finally, arduously reached to move forward, what really happens? Boards are required to discuss such money spending matters during open meetings. That means a unique major project can't be approved and accomplished in a week, or a month or even a year. . For example, the first roof replacement was in 2002. The second didn't occur for 6 years, but the board already had plans, specifications and a bidder list. Yet drainage improvements didn't occur and some units were flooded in 2008-2009. Such problems increase the costs for the HOA and a few board members understand this.

Was it because of an inability to distinguish between small problems and larger ones?
Knee jerk "call a plumber" action simply doesn't work on major capital projects. Those projects occur sequentially and each step is discussed during many HOA meetings. Each step may require one or more months simply to agree and approve each step. What is the true condition of the street, how serious is the damage and do we need an engineering analysis? Who is to perform that? What will it cost and should we spend that money? Who is to do the specifications and drawings (in house or not)? Should we hire an engineer? Should we get bids? Which engineering firms? What is the cost and is it worth it? Only after selection and award of engineering contract can the work on drawings and specifications begin. Once the first draft is received who will review them and when? After management and board discussion, back to the engineer. The engineer is requested to make changes. Then back to the board and management. Who is going to perform construction management? Go for bids and then approve which portions of that management. Select the paving contract and go for bids. Review bids and get engineering opinion. Board approval of bids. Coordinate actual construction dates with contractor's schedule and HOA schedules. Adjust schedules to avoid unnecessary delays and conflicts. Decide what to communicate to owners and when and by whom.

The patio and bridge at the Thames waterfall is an example. The board of 2008-9 discussed this problem but could not move on it. In 2010 the bridge, which required repairs to restore to safe condition was closed for several months. This got the attention of owners and dramatized the problem. It was finally worthy of serious board discussion. There were two immediate courses of action possible; temporary repairs or replacement. The board chose the band-aid, but it was finally possible to have a serious discussion during HOA meetings about moving forward with replacement. Even with that board agreement, it has taken four years to replace a walk, a bridge and repair a stream at Thames. The replacement patio has not yet been approved, but over a period of three years multiple sketches and concepts have been submitted and the area was marked by me because of board concerns about the dimensions of the patio. It could very well take another four years to complete this. Of course, delaying indefinitely means that money will never be spent. "If we don't spend it we don't have to collect it."

Many owners don't understand this and some really don't care. After all, "My personal problems should be the paramount problems in the HOA because I'm an owner and I paid my fees." (The other owners really don't know who is delinquent, and the board can't reveal this and I won't).

There was actually a serious effort underfoot to replace Lakecliffe in 2013 with a board consensus that it really, really needed to be done. But the HOA was unable to get all the necessary pieces into place for that to occur during 2013. (Hire the engineer, get approved specifications, approved drawings, go for bids, contract award, determine who is to do project management, etc.).  There were discussions about how late in the year to possibly do repave. Of course, putting in roads is dictated by the operation of the asphalt plants. If the board screws up, well, as that one owner said about his/her current inconvenience "The board should pay for this." Instead the street was patched yet again.

It seems we have sufficient funds when it comes to owner inconvenience, but not enough to move forward on projects. That's the double standard with some owners. Any HOA board that operates in accordance with the whims and wishes of these people will fail, as will the HOA.

Boards are merely owners wearing a different hat. North Lakecliffe was identified as failing in 2008. Boards for a variety of reasons were slow to respond. Being told in January 2010 that we will have to spend $100,000 on this was not something a board wanted to hear.

By the time there was a board in place and a consensus on that board that Lakecliffe was failing and action was required, it was already too late. Then it became merely another item on a list of items requiring "immediate action."

Was the attempt to run this HOA as a social club a cause?
Social clubs might view collecting fees as a secondary objective. In fact, in some clubs "If you can't pay your fees, that's okay." Social clubs are based upon acquiring members and providing activities. For example, garage sales, picnics and outings. And finding people willing to do the work to organize and publish these activities in a club newsletter.  If an attempt were made to run a HOA as a social club and if paying homeowner fees became "optional" what would be the consequence? If the emphasis of a board was on social activities instead of running the business, would that delay unscheduled capital projects? If such a board also took the perspective "If we don't spend it we don't have to collect it" as part of an approach to reduce fees, would that delay unscheduled capital projects?

Would such an approach result in a reluctance to enforce the rules, and would that increase the delinquencies?

If a board allows budget shortfalls to accrue and increase as a consequence of a failure to collect fees, will that impact capital projects?

Was it because of the attitude about HOA fees and finances?
Some owners don't want to know about any financial problem that may result in higher fees.  Other owners don't understand the nature of infrastructure failures or the costs of dealing with them. "Just get a handyman and lower my fees."

"I'm paying $189 per month in fees and that certainly should never increase. After all, we have enough money. I know this because "so and so" told me." "The board really needs to get spending under control; my fees should not be going up and up and up!" [Quotes from 2001]

"If BLMH was well run, there would be no need for fees to go up, ever!"

"I'm selling my unit. I expect to be reimbursed for my share of the funds in the HOA bank account."

"We have enough money", "We have more than enough money", "We really have too much money!"

"I love the 800 trees, but the board spends too much on tree maintenance each year." I really love that comment by an owner. Yes, but that maintenance money includes the removal of dead and dying trees, which now requires $thousands per year. [In 2009 I asked a board member about our tree reserves; I was concerned about the rising cost of dealing with dead, dying and diseased trees. I was told "trees last a long time." At the time we had no reserves for this, apparently didn't need them and never would.]

Was it because of board failure to communicate?
Owners weren't informed of the potential problem with Lakecliffe in 2010. Nor were they advised of the financial implications. Why is that? As a consequence, any new board member was completely unawares of the seriousness of this problem.

Communication by boards is one of those really difficult chores. Some boards see it as optional and to be done after everything else. Besides, there really isn't anything new going on, is there? But we do get new owners each year, so how are they to know what's going on? For a new owner it's a brave new world. Some board members see communications as a waste of time. Some are concerned about saying or writing anything that could be held to be a "promise." Some are simply unwilling to make a commitment to the owners.

Some boards avoid bad news or may have difficulty determining what is really going on in a HOA. What is the direction, what are the initiatives, what are the problems that determine the finances, and so on. Every new board is a reset in HOA direction. Every new board needs time to "get up to speed." So what to write about? If all else fails we can write about architecture in England, or have a page on the resident of the month, or whatever.

To add to the issue, some owners don't want to be treated as shareholders. However, it's my opinion that it is the duty and responsibility of the board to publish communications that reflect that. Boards are required to publish budgets and annual financial reports. After doing so, boards can do whatever they like about communications.

It can be really difficult to assemble communications because one has to understand what's really going on. "Every owner gets the annual financial statement and a budget. So why read it to them?" Here's a thought. Why not tell them why we are saving and what we intend to do with that money and when? Tell owners how well or how poorly we are doing to meet these budget goals?  "That won't work because some people will say we made a promise and we can't do that."

Okay, so in the absence of communication we'll let owners simply make up anything they want about what the board is doing. "They will do that anyway." Sure, and some will read between the lines or misconstrue what is written. But many won't. While the 80% may be complacent, they aren't the 20%. "People don't read the newsletter." That's not my problem.

A real question is and remains "What is to be communicated?"  Another is, "What's really important?"

Boards cannot divulge certain aspects of HOA operations. Who is delinquent, for example. Or who is foreclosing, or who is breaking the rules. But we can provide statistics, can't we?

Is BLMH too large to succeed?
This remains unanswered. Boards remain understaffed.

But let's look at the flip side.  In recent years any owner who may have avoided paying their fees for months obviously decided this HOA was "too big to fail." Any board unable to reign in delinquencies must have decided likewise. However, such financial problems create other pressures and distress.  With owner financial distress, "bad debt" and delinquencies, how should a board respond? Delaying capital expenditures is one way. Delay spending money. Avoid street preventative maintenance. Did this contribute to the condition of Lakecliffe?

Conclusion
When things go wrong it's easy to look for simple answers. When an aircraft falls from the sky, the experts say that it is usually the consequence of mechanical failure and pilot or other human error. There is no one, single cause and human beings are usually involved as the decision makers that led to that aircraft failure.

So too with HOAs. When things go wrong some owners come to the then current board as the simple answer.

When serious infrastructure problems occur, it may be easy to point the finger at a construction company or builder, or a board, or a manager. I think its reasonable to say that these types of failures are the consequence of the complex interaction of people. People make decisions in a HOA, not one, but many and over a period of years. Those decisions determine fees and how and when they are spent. Those decisions require establishing priorities and allocating resources. Property managers and boards are not project managers, engineers or construction managers. Some management firms may include such individuals but that is not the skill set of the property manager. But memories are short, and when certain problems occur, then some owners will say "How did this happen?" Frequently it is the same people who promoted a certain course of action. Owners are an intrinsic part of the decision making process. Owners elect the boards and it is the owners who press to achieve certain results, including reducing fees.

In this post I've provided a scenario which presents Lakecliffe as a convergence of good intentions and some less than good decisions. Taken singly, each decision might seem reasonable and should not have resulted in failure. Each decision can be argued on it's own merits and has been, by numerous boards and a variety of board members. I suspect no one single decision made after construction resulted in the current condition of the street. Instead, a series of events, some of which began years before this street was installed all converged. Those events included finances commencing decades ago, the design and installation of the street, some long held beliefs about how to maintain a HOA, and beliefs about how to keep fees as low as possible. One factor was the conflicting demands and expectations of owners, and the attempts of various boards as elected representatives to satisfy the owners. Another is the capabilities of volunteer boards. Another is chronic staffing issues.

I am of the opinion all of the decision makers did so with good intentions. I suspect there was no overwhelming desire on the part of anyone for this street to fail. But fail it did. What do I mean by "fail?" I mean the early and premature expenditure of a lot of money to replace it. That's what I mean by "fail."

What were some of the contributing factors? Owners have pressed and complained about high fees for as long as I have been here; certainly since 2001. In 2008 the owners made it a point to put in place a board to correct that. Over decades a variety of boards made decisions to avoid spending money needlessly. The definition of "needlessly" varies from board member to board member. Each owner has a different definition of "essential" spending, but it is generally true that money spent for maintenance of "my" building, patio, walks, driveway, garage, lawn, etc. is money well spent. Design sometimes occurs in house, rather than by licensed professional engineers; there is a place for this, but the street should not one of them. Project management occurred in house. There is a place for this, but the street should not be one of them. Preventative maintenance did not occur, but spot patching and then larger patching did occur. Boards were slow to respond; this is inherent in the structure and makeup of volunteer boards, as well as the frequency of HOA meetings and a requirement that all such meetings be held openly. Replacement was delayed in an attempt to reduce expenditures and reduce owner fees. The street did not cooperate and failure accelerated. Boards were sidetracked by other issues, both social and substantive. In 2008-2012 Lakecliffe was not considered to be an emergency, and in 2008-2009 it was not even considered to be a problem worthy of discussion. In 2009-2010 it began as a nuisance. It was eventually elevated to the status of an inconvenience. By 2012 a realization of possible failure became a consensus, but catastrophic failure did not seem possible. We'd undergone a change in management and the board and most were baffled. After all, this street was supposed to be okay until 2021 or so.

The question to be asked is "What can a HOA do to avoid this type of situation?" Lakecliffe serves as a beacon. It provides an opportunity for change, and it can be used constructively to build a consensus that some change is really necessary. Not the political buzzword Change, but rather a shift in perspective, the way problems are approached, the way tasks are prioritized, the character and composition of boards, the delegation of duties to property managers, the proper use of professionals, and the role of owners. Most of the owners in this HOA have regularly paid their fees. Some boards had members who did the same, showed up at meetings and merely cast votes as their primary duty. Some change really is necessary. There is absolutely no consensus that it should occur and no one is empowered to make it happen.

There are many other infrastructure and organizational issues. They simply aren't as visible or obvious as Lakecliffe. Boards are comprised of micromanagers with a different emphasis or focus for each board member.  Programmed, cyclic replacement is frowned upon, with the painting program as the one unique and repetitive, guaranteed task at BLMH. Micromanagement supposedly reduces overall costs.  It also delays replacement, prevents certain maintenance such as streets and driveways and garages and even sealcoating and carpet replacement. I suspect it supports a "squeaky wheel gets the grease" approach. There has been a slow transition, but it is an uphill battle. Without a programmed approach, new boards are likely to drop out entire tasks, and they do.

It is my opinion that a variety of boards have accomplished quite a lot at BLMH since 2008. The pace has accelerated since then. However, it is also true that our infrastructure is aging and with that age there are additional problems becoming visible. Our reserve study does address the infrastructure issues, but cannot determine the lifespan of our water mains. However, there are some things that can be done to get a better grasp on that. The completion of the street analysis by a professional engineering firm will be important for updating the reserve study. The current status of driveways, garages and roof projects will also be incorporated. Future boards should have a much superior tool as a guide. However, it is up to the boards to decide to use that tool. Perhaps it is time to turn more of this over to professionals and fund a full time manager. Boards can be more involved in identifying problems, cost centers and fund sinkholes, figuring out supplemental sources of income, or social issues and keeping owners happy.

But a variety of owners are distrustful of the boards, managers and maintenance. Owners don't like the disruption caused by the infrastructure work. The pace has quickened and for several years it seems whole areas are a construction zone. This is a consequence of a promoted plan to delay such work for as long as possible, the acceleration of certain problems including aging roofs and dying trees, unforeseen events and Lakecliffe, and the game of  "catch-up."  There is a price to pay for delay and we today are paying it.

All owners really need to get a grip on financial reality.  Our fees are not going back to $175 per month, unless future boards find other sources of income and return to a day when adequate reserve accumulation was for future owners to accomplish.

Is real change necessary? Possibly not. This HOA got to this point and various boards dealt with all kinds of issues. How will we pay for this street replacement? Simply delay other work. So why should we change? Consider the age of this complex, consider the fact that infrastructure is failing,  be it streets or water mains or even the entrances, mail boxes and garage floors. Even the lakes pose a problem, but we are tied to Wheaton about that and our "tax and spend" neighbor COD. Nevertheless it does need to be addressed.

Consider the age of the board. Change is coming. It will be the decision of all of the owners if it is to be a transition or another series of costly disruptions. We all have decisions and choices to make. Make them well. If we do that and with a little luck and by the grace of God, our fees might actually improve and we might get better results.